The most expensive word in construction is "change." Every decision made on site after work starts costs more time and more money than the same decision made on paper. For a new café, restaurant or shop in Orlando or Miami, a stack of change orders can push your opening back by weeks and blow through your budget.
The good news: most change orders are avoidable. They usually come from one source, drawings that weren't finished.
What is a change order?
A change order is a formal change to the construction contract after work begins. It adds or removes work, and usually adds cost and time. Some are unavoidable, like a hidden problem found inside a wall. Many more come from decisions that weren't made before construction started.
Why change orders happen
Unfinished drawings. If the layout, finishes or details aren't fully drawn, the contractor prices a guess, and the real cost shows up later.
Late decisions. Choosing tile, fixtures or millwork after construction starts often means rework or delays.
Equipment surprises. A new espresso machine or oven needs different power, water or ventilation than planned.
Design changes on site. Seeing the space built and wanting to move a wall or a counter.
Poor coordination. Trades working from different information, with nobody checking how it all fits together.
How to avoid them: finish the design first
The single best way to avoid change orders is to complete and approve the design before you go to bid. That means:
Layout approved: walls, counter, kitchen, seating and displays.
Finishes selected: floors, walls, counters, tile and paint, with real samples.
Lighting and electrical planned: fixtures, outlets and equipment power.
Millwork detailed: counters, shelving and built-ins drawn with dimensions.
Equipment list final: every machine with its power, water and drain needs.
When the drawings are complete, your contractor can price it right and build it once.
Use 3D visualization to decide early
Many on-site changes happen because owners couldn't picture the space from 2D drawings. Photorealistic 3D renderings let you see the finished space, and change your mind, before anything is built. Moving a wall in a rendering costs nothing.
Keep the designer involved during construction
Questions will still come up on site. When the designer stays involved through construction, those questions get fast, correct answers instead of guesses. That's why construction management is part of our standard process at Bash Design Miami. See how it works on our Commercial Interior Design page.
Frequently asked questions
Are change orders always avoidable?
No. Hidden conditions in existing buildings can cause some. But most change orders come from unfinished design and late decisions, and those are avoidable.
How much contingency should I budget for a build-out?
Many owners keep a contingency for unknowns, especially in older buildings. Your designer and contractor can recommend an amount based on the space and scope.
Do you manage construction in Orlando and Miami?
Yes. We provide design and construction management for commercial build-outs in Orlando, Kissimmee, Miami and across Florida.
Planning a build-out?
Design it completely first. Build it once.
Start your project or call (786) 777-9747.